CRA Annex VII — what goes in the technical documentation, and who gets to see it
Eight items, one of which is the SBOM and only on reasoned request. What each item means in practice, which ones do not exist yet in most companies, and the ten-year retention that makes format choices matter.
Rony Shulkin · Software Engineer

On this page
The CRA's technical documentation is specified in Annex VII of Regulation (EU) 2024/2847, required by Article 31, and it has eight items. Four of them are the familiar CE-marking contents. Four are new, and three of those four do not exist in most companies today.
One detail worth leading with, because it is widely misreported: the SBOM is item 8, supplied on reasoned request from a market surveillance authority. It is not a document you publish, and it is not something you hand to customers under this regulation. You must have it; you must produce it when asked for a stated reason.
The eight items
1. A general description of the product, including its intended purpose, the software versions affecting compliance with the essential requirements, for hardware products photographs or illustrations of external features, markings and internal layout, and the user information and instructions required by Annex II.
2. Design, development, production and vulnerability handling information, including design and development information such as drawings, schemes and a description of the system architecture; the vulnerability handling specifications — which explicitly include the software bill of materials, the coordinated vulnerability disclosure policy, evidence of the contact address for reporting, and the technical solutions for secure distribution of updates; and the production and monitoring processes with their validation.
3. An assessment of the cybersecurity risks the product is designed and maintained against under Article 13, including how the Annex I Part I requirements are applicable.
4. The information used to determine the support period under Article 13(8).
5. A list of the harmonised standards, common specifications or European cybersecurity certification schemes applied in full or in part — and where not applied, a description of the solutions adopted to meet the Annex I Part I and Part II requirements, plus any other relevant technical specifications. Where a standard is applied in part, specify which parts.
6. Test reports verifying the conformity of the product and of its vulnerability handling processes with Annex I Parts I and II.
7. A copy of the EU declaration of conformity.
8. Where applicable, the software bill of materials, following a reasoned request from a market surveillance authority, where needed to check compliance with Annex I.
What is new, relative to a RED file
Items 1, 6 and 7 are the normal CE-marking contents and you already produce versions of them. The interesting ones:
Item 2's vulnerability handling specifications. This is the big change. A RED technical file documents a product. This asks you to document a process — the SBOM, the CVD policy, the reporting contact, the update distribution design — as part of the product's technical file. The file now contains evidence about your organisation.
Item 3's risk assessment exists in a RED cyber file in substance, but Annex VII additionally asks how the Annex I Part I requirements are applicable. That is the "where applicable" chain from Part I made explicit: the risk assessment has to say which of the thirteen requirements apply and why.
Item 4, the support period basis. Genuinely new, and more than a number. You declare a support period, and the file holds the information used to determine it — expected product lifetime, customer expectations, component availability. See the support period post. A file with "support period: 5 years" and nothing behind it has met the declaration and not item 4.
Item 5's partial-application clause. The same provision exists in the RED's Annex V and is skipped just as often. Since no CRA harmonised standard has been cited yet, right now every product is in the "not applied" branch — which means describing the solutions adopted, for all twenty-one Annex I requirements. That is the single biggest documentation task in the regulation at the moment, and it shrinks only when standards arrive.
Item 6 covering the vulnerability handling processes. Read it again: test reports verifying conformity of the product and of the vulnerability handling processes. Testing a process means something like evidence it ran — advisories published, reports triaged, updates shipped — not a penetration test. Nobody has a template for this yet.
The SBOM, precisely
Because this is the most-misstated point in the regulation, worth being exact.
- Annex I Part II point 1 obliges you to draw up an SBOM in a commonly used machine-readable format covering at least the top-level dependencies.
- Annex VII item 2(b) puts the SBOM in the technical documentation, as part of the vulnerability handling specifications.
- Annex VII item 8 says it is supplied to a market surveillance authority on reasoned request, where needed to check compliance with Annex I.
So: you must have it, it is part of the file, and the disclosure trigger is a reasoned request from an authority. The regulation does not require you to publish it, give it to every customer, or put it on a product page. Many customers will ask anyway, for their own CRA obligations, and that is a commercial decision rather than a regulatory one. What the CRA asks of your SBOM goes into the content.
Retention, and why that makes format a real decision
Keep the documentation for ten years after the product is placed on the market, or for the support period, whichever is longer. For a product with a five-year sales life and an eight-year support period, you are holding records for well over a decade.
Over that horizon, three things will go wrong unless you plan for them:
- Tooling output formats change. An SBOM generated by a 2027 tool in its own JSON dialect may be unreadable by anything in 2037. This is the practical argument for a standardised format rather than whatever your scanner emits — see CycloneDX versus SPDX.
- Wikis get migrated and spreadsheets rot. The parts of the file that live in a collaboration tool will not survive two platform changes. Plain text, Markdown and PDF survive.
- The link between a test report and a build gets lost. Item 1(b) asks for the software versions affecting compliance. If your test reports do not name a build identifier that still resolves in ten years, the file documents a product you can no longer identify.
The mitigation is boring and effective: keep the version-coupled parts of the file in the product repository, tagged with the release, and generate the formal document from them. A git tag from 2027 is readable in 2037; a Confluence page is a coin flip.
A file structure that works
What I would build, with the Annex VII item in brackets:
/compliance
product-description.md [1]
intended-purpose.md [1a]
user-information/ [1d — the Annex II content]
architecture.md [2a]
vulnerability-handling/
sbom-policy.md [2b]
cvd-policy.md [2b]
update-distribution.md [2b]
contact-evidence.md [2b]
production-process.md [2c]
risk-assessment.md [3]
support-period.md [4]
standards-applied.md [5]
annex-i-assessment.md [5 — per-requirement solutions]
test-reports/ [6]
declaration-of-conformity.pdf [7]
/releases/<version>/
sbom.cdx.json [2b, 8]
test-report-summary.md [6]
build-manifest.json
Two properties matter more than the layout. Everything that changes with the code lives next to the code, so a release that changes the component set produces a diff somebody reviews. And every per-release artefact is under the release, so "which SBOM describes firmware 2.3.1" has a mechanical answer.
The annex-i-assessment.md file is the one that will be longest and the one that carries the most weight, because with no cited harmonised standard it is where you describe the solutions adopted for each of the twenty-one requirements. Treat it as the centre of the file, not an appendix.
What to do before December 2027
The documentation is the last thing you assemble and the first thing you should structure, because the structure determines whether the evidence gets captured as you go or reconstructed at the end.
- Create the skeleton now, with one empty file per Annex VII item. Empty files are a work list.
- Start
risk-assessment.md, because items 3 and 5 both depend on it, and so does every "where applicable" in Annex I. - Wire the SBOM into CI so that
/releases/<version>/sbom.cdx.jsonexists for every build from now on. Backfilling an SBOM for a release whose toolchain has moved on is painful. - Write
support-period.mdwith its reasoning, not just its number. Item 4 asks for the information behind the figure. - Leave
test-reports/for last but decide now what will go in it for the process half of item 6, because that is the item with no established practice.
Primary source: Regulation (EU) 2024/2847, Annex VII for the contents, Article 31 for the obligation, Article 13(8) for the support period, and Annex II for the user information that item 1(d) pulls in. The items above are summarised from the regulation; read the Annex before building the file around this post's reading of it.