Where the CRA harmonised standards actually stand
Thirteen months to full application, and nothing has been cited in the Official Journal. What the EN 40000 series is, what ratification does and does not give you, and how to plan when the presumption of conformity may not arrive.
Rony Shulkin · Software Engineer

On this page
As of today, no harmonised standard for the Cyber Resilience Act has been cited in the Official Journal. So no product can claim the Article 27 presumption of conformity, and no important class I product can take the self-assessment route that depends on harmonised standards being applied in full.
Thirteen months remain until 11 December 2027. The horizontal standards are moving — two of the EN 40000 series were ratified by CEN at the start of November, with publication expected imminently — but ratification of a European standard and citation in the Official Journal are two different events, and only the second one gives you a presumption of conformity.
That distinction is the whole post.
Ratified, published, cited — three different things
| Event | Who does it | What it gives you |
|---|---|---|
| Ratification | CEN/CENELEC, after a successful formal vote | A European standard exists |
| Publication | National standards bodies | You can buy and apply it |
| Citation in the OJ | The European Commission, by implementing decision | Presumption of conformity |
A standard you have applied in full, which has not been cited, is a technical specification you chose to follow. That is useful — it is defensible engineering, and Annex VII item 5 explicitly accommodates "other relevant technical specifications". It is not a presumption of conformity, and it does not open Module A for a class I product.
This is exactly how it worked for the RED: EN 18031 existed before Implementing Decision (EU) 2025/138 cited it, and the citation is what created the presumption — with restrictions, which is the other thing citation can do.
The EN 40000 series
The horizontal standards, developed under the Commission's standardisation request M/606. "Horizontal" means they apply across product categories, as opposed to the vertical standards for specific product types.
The picture as I understand it in mid-November 2026:
- EN 40000-1-1 and EN 40000-1-2 — the principles and product-security risk-management layer. Formal vote closed on 1 October 2026, ratified by CEN on 2 November 2026, publication expected around 17 November.
- EN 40000-1-3 — vulnerability handling, corresponding to Annex I Part II. At or awaiting formal vote.
- EN 40000-1-4 — generic security requirements, covering much of Annex I Part I. Still in drafting, with a delivery date reported as late 2027.
And on the vertical side, work on product-specific standards is further behind, with the router, modem and switch standard reported as the most advanced.
Two caveats on all of the above. The dates in circulation disagree with each other — I have seen 1 October, 2 November and 17 November all given as the key date for the first two parts, which is because they are three different events in the same process. And at least one credible tracker reports that EN 40000-1-2 is not expected to be cited in the Official Journal at all, which if correct means its ratification does not move the presumption-of-conformity question even slightly.
I would not build a plan on any of these dates without checking the CEN/CENELEC database and the Official Journal directly. That is not a disclaimer; it is the practical advice.
The ordering problem
Look at which parts are furthest behind: EN 40000-1-4, the generic security requirements, which is the one that would cover the thirteen product requirements in Annex I Part I.
That is the part most manufacturers need most, it is the least advanced, and its reported delivery date is inside the final months before full application. Even on an optimistic reading — delivered on time, cited promptly — that leaves very little room between a standard existing and a product being assessed against it.
The consequence for planning is uncomfortable but clear: do not plan on the presumption of conformity for Part I being available in time to shape your design. Design against the regulation text, document the solutions adopted, and treat a later citation as a bonus that simplifies your file rather than as the basis for it.
What this does to each conformity route
| Tier | With cited standards | Without cited standards, today |
|---|---|---|
| Default | Module A, standards give presumption | Module A anyway — but you describe your own solutions for all 21 requirements |
| Important class I | Module A if standards applied in full | No Module A route — Module B+C or H, with a notified body |
| Important class II | Notified body regardless | Unchanged |
| Critical | Notified body, or certification | Unchanged |
The class I row is where the absence bites hardest, and it is a large population — the 19 class I categories include operating systems, routers, smart home security products, connected toys with social or location features, and microcontrollers with security functions.
If no suitable standard is cited in time, every one of those products needs a notified body. Set that against the fact that CRA notified bodies have only been designatable since 11 June 2026, and the capacity arithmetic for 2027 gets worse than it already looked. The conformity routes post has the detail on why capacity, not engineering, is the likely binding constraint.
How to plan against this
Five things, ordered by how little they depend on what the standards bodies do.
1. Do the work that is standard-independent. The four non-retrofittable Part I requirements — factory reset completeness, the update state machine, the interface inventory, the storage erase path — are architecture. No standard will make them cheaper, and no standard is needed to start.
2. Build the Part II process now. Vulnerability handling, disclosure, SBOM, update distribution. The longest lead time in the regulation, entirely independent of the Part I standards, and the part that cannot be compressed. The eight duties.
3. Write the Annex I assessment against the regulation text. Item 5 of Annex VII asks, where standards are not applied, for a description of the solutions adopted. Right now that is the required form of the document for every product. If a standard is cited later, you re-map an existing assessment — which is far less work than writing one under time pressure.
4. If you are class II or critical, talk to a notified body about 2027 capacity now. Not to engage them. To find out whether they will be designated and when they will have slots.
5. Watch the Official Journal, not the news. The event that changes your route is an implementing decision citing a standard. Everything before it — ratification, publication, committee progress — is useful context and changes nothing legally.
The honest position
Thirteen months out, the CRA's conformity machinery is incomplete in a way that is material to planning. The reporting obligations are live. The requirements are known. The route by which most products were expected to demonstrate conformity is not yet available, and for the single most important horizontal part it may not be available in good time.
That is not a reason to wait. It is a reason to spend the next thirteen months on the parts whose answer does not depend on a standards committee: the architecture that cannot be retrofitted, the vulnerability handling process that takes a year to build, and a technical file that describes your own solutions clearly enough to survive either outcome.
Primary sources: Regulation (EU) 2024/2847 Article 27 for the presumption of conformity, Article 32 and Annex VIII for the routes, and Annex VII item 5 for the documentation where standards are not applied. For standards status, the CEN/CENELEC standards database and the Official Journal's harmonised standards listings are the only authoritative sources; the dates in this post are as reported in mid-November 2026 and should be re-checked rather than relied on.