Cyberwiz is now Cybreeze.

15 August 20268 min read

RED, the CRA and EN 18031 — which regime your product is under, and when it changes

Two cybersecurity regimes apply to connected products in the EU, one after the other, with a handover on 11 December 2027. Which one covers you today, what the overlap costs, and the dates that actually bind.

Michael Parkadze · Software Engineer

On this page
  1. The two regimes side by side
  2. The dates that bind
  3. What "placed on the market" does to the handover
  4. What each regime actually asks for
  5. What carries over, and what does not
  6. A sequencing that works
  7. Where to check rather than trust

If you sell a connected product in the EU, two cybersecurity regimes matter and they do not apply at the same time.

Today, if your product is radio equipment — anything with Wi-Fi, Bluetooth, cellular or any other radio — you are under the Radio Equipment Directive's cybersecurity articles, 3(3)(d), (e) and (f), which have been mandatory since 1 August 2025. From 11 December 2027 the Cyber Resilience Act applies to every product with digital elements, radio or not, and the RED cybersecurity requirements are withdrawn.

That is the whole map. The rest of this post is the detail that makes it actionable, because the handover is not clean and the two regimes ask for different artefacts.

The two regimes side by side

RED Article 3(3)(d)(e)(f)Cyber Resilience Act
InstrumentDirective 2014/53/EU, activated by Delegated Regulation (EU) 2022/30Regulation (EU) 2024/2847
ScopeRadio equipment onlyAny product with digital elements, plus remote data processing solutions
Mandatory since1 August 202511 December 2027 (reporting earlier — see below)
RequirementsThree essential requirements, elaborated by EN 18031Annex I: 13 product requirements plus 8 process requirements
Harmonised standardsEN 18031-1, -2, -3:2024, cited with restrictionsNone cited yet
Who assessesManufacturer, or a notified body where the standards are not fully appliedManufacturer, or a notified body depending on Annex III class
FormDirective — transposed into national lawRegulation — directly applicable

The last row is not a footnote. A directive is transposed by each member state, which is why RED market surveillance feels different in Germany and in Ireland. A regulation is the same text everywhere, so the CRA removes a layer of national variation that RED still has.

The dates that bind

These are the ones to put in a plan. Everything else is commentary.

DateWhat happens
1 August 2025RED 3(3)(d), (e), (f) become mandatory for radio equipment placed on the market from this date
10 December 2024CRA enters into force — no obligations yet, the clock starts
11 June 2026CRA Chapter IV applies: member states may notify conformity assessment bodies, so notified bodies can start being designated
11 September 2026CRA Article 14 reporting applies: actively exploited vulnerabilities and severe incidents must be reported
11 December 2027CRA applies in full. Essential requirements, conformity assessment, CE marking
11 December 2027Delegated Regulation (EU) 2022/30 is repealed, by Delegated Regulation (EU) 2026/339

The two entries on 11 December 2027 are the handover. The Commission adopted 2026/339 on 16 February 2026 and published it on 29 April 2026, specifically so that the RED cybersecurity requirements and the CRA essential requirements would never both be in force for the same product. Recital 3 of that regulation says as much: Annex I of the CRA already covers the ground that RED 3(3)(d), (e) and (f) covered.

Note the ordering problem this creates. CRA reporting starts on 11 September 2026 — about four weeks from now — but the CRA essential requirements do not. For a year and three months you can be obliged to report an actively exploited vulnerability in a product whose security requirements still come from RED. That is not a drafting error; reporting was pulled forward deliberately. It does mean the reporting process has to be built before the design requirements it will eventually sit beside.

What "placed on the market" does to the handover

This is the part teams get wrong, and it is worth being precise about.

EU product law attaches obligations to the moment a unit is placed on the market — the first making available of that individual unit in the Union. It is per unit, not per model. A product you shipped in March 2026 was placed on the market under RED and stays assessed against RED, for the life of that unit. A product placed on the market on 12 December 2027 is a CRA product.

Three consequences:

  • Units shipped between 1 August 2025 and 10 December 2027 remain RED units. The repeal of 2022/30 does not retroactively convert them. Market surveillance authorities keep their powers over those units after the repeal, which is why the repealing regulation deals with continuity rather than simply deleting the obligation.
  • If you ship continuously across the boundary, you need both files. The same model can have RED-assessed units in the field and CRA-assessed units leaving the factory. The technical documentation is per assessment, so you will be maintaining two.
  • Stock in a warehouse is not yet placed on the market. Units you manufacture in 2027 and first sell in 2028 are CRA units. If you are planning a large pre-build to get under the wire, check this carefully against the Blue Guide before relying on it — the answer depends on the distribution arrangement, not the manufacturing date.

What each regime actually asks for

The requirements are genuinely different in shape, not just in wording.

RED gives you three essential requirements and leaves the elaboration to a harmonised standard:

ArticleIn plain termsStandard
3(3)(d)Do not harm the network, or misuse network resourcesEN 18031-1
3(3)(e)Protect personal data and privacyEN 18031-2
3(3)(f)Protect against fraudEN 18031-3

Which of the three apply depends on what your product does, and the scoping is narrower than people assume — see which EN 18031 parts apply to your product.

The CRA gives you 21 requirements directly. Annex I Part I has a risk-based opening point and then thirteen lettered requirements covering the product — no known exploitable vulnerabilities at release, secure by default, attack surface minimisation, confidentiality and integrity of data, logging, and so on. Annex I Part II has eight process requirements covering the vulnerability handling you must run for the whole support period: component documentation including an SBOM, remediation, testing, disclosure, a coordinated vulnerability disclosure policy, information sharing, secure update distribution, and free dissemination of patches.

The shift from three to twenty-one is the real change, and it is less about security engineering than about process. RED asks whether the product is built correctly. The CRA asks that, and then asks you to prove you will keep it correct for years.

What carries over, and what does not

If you have done RED cybersecurity work, some of it is reusable.

Carries over well:

  • The risk assessment. The CRA requires one in Annex I point 1 and documents it in Annex VII. A RED cyber risk assessment is the same artefact with a wider scope.
  • Access control, secure update and cryptography mechanisms. EN 18031's mechanisms map closely onto Annex I Part I points on authentication, integrity and confidentiality.
  • Test reports, if they were written against identifiable requirements rather than against "EN 18031" as a block.
  • The notion of a technical construction file, and the habit of keeping it current.

Does not carry over:

  • The SBOM. RED does not require one. The CRA does, in Annex I Part II point 1, in a commonly used machine-readable format covering at least top-level dependencies. Most RED files have no component inventory at all.
  • The support period. A RED file says nothing about how long you will ship updates. The CRA makes it a declared, binding figure — see the support period and what you are promising.
  • Vulnerability handling as a running process. EN 18031 has a secure update mechanism requirement. It does not require you to operate a disclosure policy, publish advisories or report to a regulator.
  • Reporting. Entirely new. There is no RED analogue of Article 14.

A sequencing that works

If you are a manufacturer with radio products on sale now, the order matters more than the content, because the deadlines are staggered.

  1. Now: confirm which EN 18031 parts apply and whether your current file relies on any of the restricted clauses. The restrictions on the standard are narrow but they decide whether you can self-assess — see the EN 18031 restrictions.
  2. Before 11 September 2026: have a reporting path. Not a policy document — a named person, an out-of-hours route, and a decision rule for what counts. Four weeks is enough for this only if you start now.
  3. Through 2027: build the SBOM pipeline and the vulnerability handling process. These are engineering projects with lead times, not documents you write in the last quarter.
  4. Mid-2027: classify your products under CRA Annex III and decide conformity routes. If anything lands in class II or Annex IV, you need a notified body, and the queue for those will not be short.
  5. Before 11 December 2027: the technical documentation, the declaration of conformity, and the user information in Annex II.

The thing worth internalising is that steps 2 and 3 are the long ones and they are both process rather than product. A team that treats the CRA as a design review will arrive in late 2027 with a secure product and no evidence it is maintained — which, under Annex I Part II, is the half that fails.

Where to check rather than trust

Every date and article number above is checkable, and should be checked, because secondary summaries of this material disagree with each other surprisingly often. The primary sources:

Where this post reads a requirement, it is reading the text. It is not legal advice, and on anything load-bearing — particularly the placed-on-the-market analysis — the answer belongs to someone whose professional indemnity covers it.

Filed underProduct security