CRA reporting is live — the 24-hour clock started on 11 September
Article 14 applied from 11 September 2026, more than a year before the rest of the CRA. What has to be reported, to whom, in what window, and the three things to have in place before the first one.
Rony Shulkin · Software Engineer

On this page
The first part of the Cyber Resilience Act to bite took effect two days ago, on 11 September 2026, and it is the operational part rather than the design part.
From now, a manufacturer who becomes aware of an actively exploited vulnerability in a product with digital elements, or a severe incident having an impact on the security of such a product, must report it — an early warning within 24 hours, a fuller notification within 72 hours, and a final report later. Reporting goes to the designated national CSIRT and to ENISA simultaneously, through a single reporting platform.
The essential requirements in Annex I do not apply until 11 December 2027. The reporting does. That gap is deliberate and it is the thing to plan around: for the next fifteen months you can be obliged to report a vulnerability in a product whose security requirements still come from the RED.
The clock
| Stage | Deadline | Content |
|---|---|---|
| Early warning | 24 hours from becoming aware | Minimal. An indication that the vulnerability is actively exploited, and the member states where the product is available |
| Notification | 72 hours | General information about the product, the nature of the exploit or incident, and any corrective or mitigating measures taken or available |
| Final report | 14 days after a corrective measure is available (vulnerability), or one month after the 72-hour notification (severe incident) | A description of the vulnerability, including severity and impact, and where available the root cause and applied mitigations |
Two mechanics worth being precise about, because secondary summaries disagree on both.
"Becoming aware" is the trigger, not "confirming". The 24-hour window runs from awareness. In practice that means the clock can start with a credible third-party report you have not yet reproduced. Waiting for confirmation before starting the clock is a reading the text does not support.
Check what the 72-hour window runs from. Some commentary describes it as running from the early warning rather than from awareness, which would make the practical gap 48 hours rather than 72. The difference matters for a runbook, and the answer is in Article 14 itself rather than in anyone's summary — including this one. Read it before you write the SLA into a process document.
What has to be reported
Two triggers, and both are narrower than people assume on first reading.
An actively exploited vulnerability. Not every vulnerability. Not a high-CVSS finding from a scanner. Active exploitation means there is evidence the vulnerability is being exploited. A proof of concept published on a mailing list is not, by itself, the same thing — though it is a strong signal that the situation is about to change. What counts as actively exploited goes into the judgement, because it is a judgement.
A severe incident having an impact on the security of the product. This is about incidents affecting the product's security, which is not the same as every incident at your company. A compromise of your build pipeline is squarely in scope. A phishing incident in your sales team is not, unless it reached something that affects the product.
What is explicitly not in scope: vulnerabilities you found yourself and fixed quietly with no evidence of exploitation. The CRA requires you to handle those — Annex I Part II — but Article 14 is about exploitation and incidents, not about your backlog.
Where the report goes
A single submission reaches both recipients. The CSIRT designated by the member state is the primary recipient and ENISA receives it at the same time, through the platform established under Article 16.
A practical note on the platform: reports of its availability and address have been inconsistent, and at least one account says an account is created only when a notification is submitted. Before you need it, find the current address from ENISA's own pages and from your national CSIRT, and record both in the runbook. Do not take the URL from a blog post, this one included — there is no URL in this post for that reason.
Also worth doing now: identify which national CSIRT is yours. If you are established in one member state and sell across the Union, the designation question has an answer, and finding it out at hour three of a 24-hour window is the wrong time.
Three things to have in place
Not a policy document. Three operational things, in order of how often their absence causes a problem.
1. A route in, that is monitored
Somebody outside your company has to be able to tell you about an exploited vulnerability, and reach a human, quickly. If the only path is a contact form that lands in a shared inbox, your 24-hour clock starts whenever someone next reads it — which is not a defence, because awareness is measured from when the report arrived.
The CRA will require a coordinated vulnerability disclosure policy from December 2027 under Annex I Part II, and there is no reason to wait for that. A security.txt and a monitored address is an afternoon of work — see a CVD policy the CRA will accept.
2. A named decision-maker, with an out-of-hours path
The 24-hour window includes nights and weekends, and it does not pause. The decision "is this actively exploited, and is this product in scope" has to be makeable by someone who is reachable. One named person with a deputy, in the on-call rotation, with the authority to submit.
The failure mode here is not malice or laziness. It is that the first report arrives on a Friday evening, the person who could make the call is not in the rotation because this was treated as a compliance matter rather than an operational one, and twenty of the twenty-four hours are spent finding out who decides.
3. A pre-written early warning
The 24-hour submission needs very little: an indication of active exploitation and the member states where the product is available. Both of those can be prepared in advance.
The member states list in particular should already exist. If answering "which member states is this product available in" requires asking sales, that is a question to resolve now, per product, and keep current. It is also the kind of thing that is genuinely hard to answer quickly for a product sold through distributors.
What this does not require yet
Worth saying clearly, because the September date has been reported as "the CRA applies now" in places.
Not yet required: the Annex I essential requirements, the SBOM, the technical documentation in Annex VII, CE marking under the CRA, the declared support period, the conformity assessment. All of that applies from 11 December 2027.
Required now: reporting, as above, for products with digital elements you have placed on the market. Note that this includes products already in the field — the obligation attaches to you as manufacturer of a product in use, not only to things you ship from today.
That last point is the one worth checking against the text for your own situation. The scope of the reporting obligation with respect to products placed on the market before 11 September 2026 is set out in the application provisions of the regulation, and it is the question most likely to be summarised wrongly elsewhere.
The honest summary
Article 14 is not hard to comply with. It is easy to fail by not having built the operational path, and the operational path takes about a week of real work: a monitored inbox, a rotation entry, a one-page decision rule, a template, and a list of member states per product.
The regulation's own text is short — Article 14 is about a page, Article 16 covers the platform, and Article 15 deals with voluntary reporting. Read them: Regulation (EU) 2024/2847. This post describes what the articles say and flags two points where secondary sources conflict; it is not legal advice, and the reporting decision for a live incident is not one to make from a blog post.